Welcome to our adventure,

HALE HALE HALE

(in Hawaiian, hale means house.  We found out that Torrence translates into Hale Hale.)

Carpet is in and the furniture FINALLY comes out of the basement...

kitchen cabs2.JPG (269708 bytes)   kitchen  kitchen cabs.JPG (257200 bytes)  view from great room  doors.JPG (175094 bytes)

 guest rm 2.JPG (152563 bytes)  guest room    guest room sign.JPG (195955 bytes)  

master bed.JPG (262459 bytes)  master bedroom  master view.JPG (241147 bytes)

theatre seating.JPG (197232 bytes)  who has the popcorn????   theatre seating2.JPG (207427 bytes)  

shop2.JPG (277809 bytes) embroidery shop  shop.JPG (277229 bytes)   

 

TIME LINE

December 13, 2004 Furniture finds its new home; china finally gets unpacked.
November 22, 2004 Carpet installed.
October 20, 2004 Tiling begins on the bathrooms and entryway.
September 15, 2004 Paint inside and outside.
September 1, 2004 Dry wall gets textured inside while siding goes up outside.
July 31, 2004 Insulation and dry wall begin...
July 30, 2004 Rough plumbing, electrical and framing inspections pass
May 15, 2004 Rough plumbing & electrical begin...
May 8, 2004 Roofing is done - time for the Topping Off Party!
April 30, 2004 Moved out of rental house; stored everything in basement
April 2004 Roofing
March 2004 Rooms take shape and   Wow!  What a view from the back!
Feb 5, 2004 Framed our FIRST wood wall
Feb 4, 2004 Poured LAST concrete wall
January 6, 2004 Poured concrete slab/foundation - FINALLY!
November 3, 2003 Received building permit
October 22, 2003 First concrete poured
September 15, 2003 Received grading permit & broke ground
August 27, 2003 House plans are approved by community design review
March 7, 2003 Moved to Maui
August 13, 2002 Lot #23 is ours
April, 2002 Paradise found

 

 John and Barbara Torrence, 2984 Aina Lani Drive, Pukalani, HI  96768
home #808-573-0628
toll free work # 877-997-2502

btjt.jpg (13292 bytes)